So why is it painted yellow? This is Network Rail’s colour, chosen to look like no-one else’s livery and probably also because most of the “yellow plant” (rail-mounted kit for maintaining the track and wires) and engineering trains (essentially freight trains transporting ballast or track) need to be visible in the dark, because we rail engineers rarely have the luxury of being able to do construction work during the day!
But the yellow train I like to watch out for is an HST (that’s your average intercity-type passenger train to non-trainspotters) painted bright yellow and marked “New Measurement Train” on the side. This one train is a piece of technology that has revolutionised how we maintain the UK railway because it travels the whole passenger network over a regular cycle and measures the condition of the track and the overhead wires (are they in the right place and delivering the right amount of power?), saving thousands of hours of track inspection time.